Hi i have the next question, if i would schedule two backups at the same time (hence backup 1 9:00 and backup 2 9:00) will BU4A do only one job or both, when it does both can i then put all backups at the same time.
If two backup jobs are scheduled to start in the same time, both will be executed.
All backup jobs scheduled to start at the same time will start.
However we do not recommend you to schedule multiple jobs in the same time as your computer could be slow.
We recommend you to put all backup jobs in a backup group. Scheduling that backup group will run the backup jobs inside one after another.