Move backup jobs in group to control run order
I would like to perform several backup jobs to a local destination and finally run a mirror backup to copy all to an offsite ftp location.
This works fine, but now I want to add another local backup task I can't move this ahead of the mirror backup.
I read the release notes for build 189 said that you can change the order by dragging and dropping the backup jobs, but this doesn't seem to be working for me - what am I missing? (I am using build 214).
Thanks
Matt
This works fine, but now I want to add another local backup task I can't move this ahead of the mirror backup.
I read the release notes for build 189 said that you can change the order by dragging and dropping the backup jobs, but this doesn't seem to be working for me - what am I missing? (I am using build 214).
Thanks
Matt
-
- Posts: 1956
- Joined: Wed Dec 16, 2009 12:46 pm
Re: Move backup jobs in group to control run order
Hi,
Please go to View menu->View jobs as->Tree.
Now you can change the backup jobs order.
Please go to View menu->View jobs as->Tree.
Now you can change the backup jobs order.
Do you know you can monitor your backups remotely with Backup4all Monitor? You can read more here: https://www.backup4all.com/backup4all-monitor.html