Hello Adrian and everyone at Backup4All,

I find that the scheduling system for B4A projects is excellent and makes my life easier.
However, IT being IT, a scheduled backup might not be quite timely enough and running a backup during certain times may impact daily operations.
So I thought, without reverting to using the scheduler is it possible to schedule a backup to start at say 1am, on an ad-hoc/impromptu basis?
Ideally, what I would like to do is right click on a backup entry in B4A, have a menu item option, such as:

Run Backup ==> Now (<-- this menu entry not really necessary, of course, but entered for completeness of example)
==> In 1
==> In 2 Hours
==> In 5 Hours
==> at a nominated time (This calls a dialog by which the time can be set)

Is this currently achievable or is it something you would consider adding to an upcoming version release?

regards and thanks

SeaCay

Adrian (Softland)
Posts: 1914
Joined: Wed Dec 16, 2009 12:46 pm

Re: Quick Scheduling for Backup Activation

Post by Adrian (Softland) »

Hi,

We added your request to our Wishlist.